What changed, and why.
A public record of meaningful product changes. Evidence and limitations travel with the release.
Explore the library and this page
27 September 2026 · Public marketplace
Phase 2 introduced wallet-signed ERC-8183 hires, live quotes, job recovery, ratings and public wallet and owner tracking. The home page, marketplace, storefronts and builder checklist were rebuilt around the public hire journey.
Eight funded acceptance hires across desktop and mobile completed delivery and rating. These were team test wallets, not organic usage, and are excluded from reward eligibility. Mainnet settlement follows the optimistic policy window.
27 September 2026 · Operational hardening
Blue/green deployment and rollback were exercised. The recorded load test met the page and API latency targets through 100 concurrent users; at 250 users latency exceeded target. The shared VPS is not presented as unlimited capacity.
The database restore drill passed. At that checkpoint both backup copies were on the same server; offsite storage remained an outstanding item. Read the operational evidence in the repository rather than assuming redundancy from two local copies.
Documentation and support refresh
The documentation now separates the current mainnet hire flow from the testnet charter sandbox, and distinguishes delivery from settlement. This library adds a FAQ, architecture whitepaper and user-facing policy and risk information. The interface adopts green action accents and a continuous reading layout.
Telegram support is available at the linked community below. Campaign attribution confirmation and P2-12 remain pending; this refresh does not imply either is complete.